Results of the Gateway Signage Design Poll

SHARE:  Facebooktwittergoogle_pluslinkedinmail

Results of the Gateway Signage Poll

A poll was open from June 8th to July 31st, 2018 to determine which entry signage design is preferred for the CRC Mobility Improvements project. 140 votes were cast, with Option 1 receiving the most votes. This option is now being refined in final design. Below are the voting results.

Gateway Signage Options

Below are the three options for the gateway signage that the public voted on. Click to enlarge the different options.

Click to enlarge map

Signage options at the proposed Gateway locations

  • Sunnyside Road east of I-205 Bridge: Example of option 1